WOOT!
10 days after getting the keys, I’ve got the following done!
- Got 3 contractors to quote
- Bought a double basin single drainer
- Bought a single inlet, double outlet kitchen tap for dry kitchen
- Bought a single inlet, single outlet kitchen tap for wet kitchen
- Bought a sink for the common toilet
- Bought floor tiles for common toilet
Found & to buy:
- Really bright ceiling lights for RM160 x 2
- Flourescent lights for RM39 x 2
- Floor drain trap RM12 x 2
- WC RM299 x 1
- Wall Fan Panasonic x 2
- Stand Fan
- Kitchen Mosaic tiles RM12 x 12
- Spot/track light RM120 x 1
- Panasonic Air Conditioning x 1
Whoa. So many things. Blah.