02
Nov
09

almost kicking off renovations @ Project Home

WOOT!

10 days after getting the keys, I’ve got the following done!

  1. Got 3 contractors to quote
  2. Bought a double basin single drainer
  3. Bought a single inlet, double outlet kitchen tap for dry kitchen
  4. Bought a single inlet, single outlet kitchen tap for wet kitchen
  5. Bought a sink for the common toilet
  6. Bought floor tiles for common toilet

Found & to buy:

  1. Really bright ceiling lights for RM160 x 2
  2. Flourescent lights for RM39 x 2
  3. Floor drain trap RM12 x 2
  4. WC RM299 x 1
  5. Wall Fan Panasonic x 2
  6. Stand Fan
  7. Kitchen Mosaic tiles RM12 x 12
  8. Spot/track light RM120 x 1
  9. Panasonic Air Conditioning x 1

Whoa. So many things. Blah.


0 Responses to “almost kicking off renovations @ Project Home”



  1. No Comments Yet

Leave a Reply




passing tweets


Passing Links










People passing by

  • 11,893 hits